Risk Based Inspection
- Increased facility availability, improved reliability
- Focused inspection on high risk equipment
- Increased intervals between inspections
- Shorter and fewer facility shutdowns
- Clearer understanding of high-risk equipment and ability to implement mitigation measures
- Identified deterioration modes and mechanisms
- Significant reduction in total cost of inspection
- Regulatory compliance/acceptance
- Improved Turnaround planning
- Better-informed, documented, defensible decisions
There are a handful of standards and recommended practices covering RBI such as API 580/581, ASME PCC3, DNV-RP-G101, & RIMAP. Most of these guidelines provide either oversimplified or complex explanations. For starters, it is difficult to learn all the aspects that are critical to the successful implementation of RBI. The purpose of this article is to discuss the fundamental elements of effective RBI system implementation in a simplified manner.
- Solid commitment from the management and stake holders
- A team of knowledgeable, qualified specialists and engineers from departments such as corrosion, inspection, maintenance/reliability, process, production and operation etc.
- Availability of design, construction, historical records and inspection data
- Suitable methodology and software for the assessments
- Utilization of latest technologies for inspection
RBI programs may suffer in delivering desired results due to lack of understanding regarding the effective implementation strategy and these essential elements. A general misconception regarding RBI is “the reduction of inspection cost”, which may not necessarily be true all of the time as the focus of RBI is to understand and reduce the risk associated with the operation of an asset or facility, not just the inspection costs. However, cost reduction can be an attribute of a well-implemented RBI program, which is achievable long term. Therefore, a better understanding of inputs and outputs is required before and after implementation.
ICE shall offer the following in its RBI program:
- Establishing the Specification/Standard Operating Procedure for RBI
- Develop the Key data input for RBI ranging from Corrosion Control Documents,Corrosion Circuits, Integrity Operating Windows, Assets Data Base, Inspection and Maintenance History
- Choosing the best RBI tool/solution that would meet the client’s needs and requirements
- Facilitating the RBI workshops
- Issuance of RBI reports, inspection and monitoring plans
- Provide RBI training